Article details and a research prompt are prepared automatically.

Porcelain honeycomb panels can reduce the weight of a replacement facade and provide a porcelain finish in a thin composite construction. In a renovation, the first decision is whether to remove the old facing or retain it behind a new wall build-up. Those two routes change the added load, fixing path, window details and work sequence.

Funtek’s panel combines one 3–6 mm ceramic face with a PU fiberglass-faced aluminum honeycomb backing. The product information gives an approximate complete-panel weight of 9–16 kg/m², depending on the selected configuration. Use that weight for the new panel line in a renovation calculation; include the rails, brackets and retained wall layers separately.

Recladding or Overcladding: What Changes in the Existing Wall?

Recladding removes the existing facing and replaces it with a new assembly. Overcladding retains some or all of the existing facade and adds a new outer assembly. Both can use lightweight panels, but they do not solve the same site conditions.

Removal exposes the original substrate, making deterioration and fixing locations easier to examine. It also creates demolition waste and a period when the old weather protection is absent. Retaining the facing avoids part of that demolition, but the new support system must pass through or stand clear of the retained material. The old finish does not become a structural support simply because it remains in place.

Swipe sideways to compare both renovation routes.

Recladding and overcladding compared by project task
Project task Remove and replace Retain and cover
Existing layers Existing tile removed to expose the wall backing
Remove the facing and unsuitable original supports. Inspect and repair the backing before the new work closes it.
New cladding in front of an existing wall
Retain identified suitable layers. Record their condition and include their mass in the complete wall proposal.
Fixing path Rear panel connection and supporting metalwork
Connect the new panel and rail assembly to the exposed, evaluated backing.
Rails in front of retained facade material
Reach the structural backing through or around retained layers; resolve longer stand-offs and intervening voids.
Opening depth Measurement of an existing window reveal
Coordinate the replacement assembly against the existing frame, sill and head after removal.
New cladding and a recessed window sill
Check the additional projection of the outer face and any sill extensions, returns and drainage changes.
Work sequence Screened facade work zone beside a finished entrance
Allow for demolition, backing repair and temporary weather protection before closing each zone.
Facade drawings reviewed beside a material sample
Coordinate survey openings, drilling, new supports and panel delivery around retained construction.

Decide what stays before comparing quotations. A price for panels fixed to an exposed, repaired concrete wall cannot be compared directly with a price that includes long brackets, drilling through old finishes and new window flashings.

Survey the Existing Facing, Substrate and Water Damage

Begin with the material that is actually on the building, its attachment and the backing behind it. Record whether the old facade is adhered tile, mechanically fixed stone, precast, masonry or another construction. Photograph representative bays, corners, ground-level damage and window interfaces so a later drawing can be traced to a real location.

Surveyor examining the facade of an existing office building
Start with a location-based survey of the existing wall and its openings.
Small area of removed facade tile revealing the original backing
A local opening helps identify layers that cannot be confirmed from the finished surface.

A local opening is especially useful when drawings do not match the building. It can reveal adhesive thickness, the position of a backing wall and whether a visually solid area conceals a cavity. Record what the opening shows rather than extending one observation to the whole elevation. Conditions near a parapet, a window and the bottom of the wall can differ because water enters and drains at different locations.

Map cracks, staining, loose pieces and displaced joints. A stain below a window may indicate a failing sill or membrane interface; adding a new panel without correcting that route can leave the source of water in place. When original supports will be removed, record how the wall is temporarily protected during the interval before the new assembly closes it.

Choose the retained layers from the wall survey. Keeping an old facing is useful only when the new support, weather protection and opening details can work around it.

The survey should leave the team with elevations marked by construction type, photographs keyed to those elevations, opening locations and a clear list of areas that require repair or further investigation. This is more useful to a facade designer than a folder of unlocated close-up photographs.

Compare Removed, Retained and Added Dead Loads

Calculate the change in load for each route rather than describing the panel alone as light. The simple mass calculation is area × mass per unit area. The net change then adds the new panel, rails, brackets and other new layers and subtracts the material actually removed.

Worked planning example: assume a 300 m² elevation, a selected composite panel at 12 kg/m² and a surveyed existing facing at 30 kg/m². The new panel line is 300 × 12 = 3,600 kg. The existing facing line is 300 × 30 = 9,000 kg.

If that facing is removed, the change attributable to those two facing lines is 3,600 − 9,000 = −5,400 kg. If it stays, the new panel adds 3,600 kg before new rails, brackets and other retained or added layers are counted.

This example explains why the same panel can produce different renovation outcomes. A replacement route removes weight as well as adding it; an overlay adds an outer assembly to what remains. It also shows why a reduction in facing weight does not establish the capacity of an individual anchor or an original wall.

Completed large-format exterior cladding on a commercial building
Panel quantities and wall area are only part of the complete facade mass.
Composite cladding panels staged in an installation area
Include staged materials and site access in the delivery plan, separately from permanent facade loads.

For the new product inputs, use the panel thickness, size and weight guide. A 1,200 × 2,800 mm panel has an area of 3.36 m². At the example 12 kg/m², its panel mass is 40.32 kg. Add any attached hardware when preparing a handling plan, and use the actual package mass for unloading crates.

The product’s own wall comparison gives another useful reference: 28 kg/m² for its traditional 12 mm solid ceramic configuration versus approximately 9–16 kg/m² for the PU composite. At 1200 × 2800 mm, that is about 94 kg against 30–54 kg. Replacing that facing with the composite reduces the weight of each large piece and the facing mass transferred to the new supports. For natural stone or another existing finish, use the surveyed material weight in the same calculation.

Weight is only one reason to select the PU fiberglass backing for recladding. Its thermal movement is closer to the ceramic face, helping reduce temperature-related bending, cracking and delamination within the new panel. Maintaining the panel plane also helps rear fittings stay aligned during hanging. The thermal-expansion and backing comparison explains this material choice.

Trace the New Panel Loads Back to the Structure

The new panel transfers its weight and wind actions through its rear connection, the supporting rails and brackets, and the anchors into the building. In an overclad wall, those supports may cross old facing, insulation or a void before reaching the structure. Each intervening layer changes the connection geometry.

Porcelain facade panels being installed on a rail system over an older wall
The rail position and its connection to the building determine the new wall plane.
Rear connection fitted to a PU fiberglass-faced honeycomb panel
The panel-side connection is one part of a longer path back to the building.

Measure the stand-off distance from the structural backing to the rail. Increasing it changes bracket geometry and the space needed to level the rail system. Identify where anchors encounter old joints, voids or damaged areas so the support layout can be coordinated before drilling begins.

Funtek’s material shows rear connections using embedded M8 components and riveted or mating fittings for relevant arrangements. The panel installation and fixing guide explains those panel-side details. A renovation drawing must also show how the selected connection reaches the existing structure; repeating a typical panel clip does not complete that drawing.

Do not use the flatness of a thin new facing to correct a distorted old support. Establish the supporting plane first. Otherwise the installer may be forced to pull a panel toward misplaced fittings, creating local stresses and losing the alignment that the new facade was intended to provide.

Resolve Window Returns, Corners, Drainage and Fire Interfaces

A new outer face changes the depth of every window reveal. Measure the proposed finished plane against the existing frame, sill and head. A sill that projects beyond the old wall may end behind the new surface, leaving water without a clear route out. Its extension, joints and end conditions must be considered with the panel return.

Tape measure checking the depth of an existing window reveal
Measure the existing reveal before selecting the thickness and position of the new assembly.
Completed porcelain cladding around a recessed window and metal sill
The panel return, window joint and sill have to form one coordinated opening detail.

At corners, determine whether two flat panels meet, a separate return is used or a prefabricated corner is proposed. The choice affects the visible edge, rear fixing clearance and panel dimensions. Use the fabrication, exposed-edge and corner guide to develop these parts without treating an aluminum honeycomb panel’s folding method as a ceramic fabrication method.

Keep rainwater exits, ventilation paths and required cavity barriers visible on the proposed sections. A retained layer can interrupt a new drainage path; a bracket can cross a cavity barrier; a deep return can cover a weep. These are spatial coordination questions that should be resolved while the wall is still on the drawing.

The composite’s product fire classification and the requirements for a complete exterior wall are different pieces of information. Select the actual panel construction and match it to the project’s wall requirements, including retained materials, insulation and cavity details. The refurbishment route should not conceal old combustible layers from the assessment.

Plan Phased Work Around Occupied Areas

Split the elevation into work zones that can be surveyed, prepared, enclosed and handed over in a defined order. A zone should be small enough to protect while open and large enough to use the access equipment and delivery space efficiently. Tenant entrances, escape routes and deliveries have to remain compatible with that order.

Project team reviewing a facade elevation and porcelain sample
A marked elevation connects the survey, panel layout and installation sequence.
Screened facade renovation zone beside a completed commercial entrance
Plan the temporary separation between active work and occupied parts of the building.

Coordinate panel IDs and crate contents with the zones. If the first required corner panel is packed behind materials for a later floor, the crew has to move and expose more finished pieces than the installation needs. The receiving and handling workflow explains how the delivery record and panel register can preserve that sequence.

Before removing a facing, identify the temporary weather protection and the point at which the next zone can open. Lighter, reinforced pieces and rear fittings that can be aligned to the coordinated supports help the crew move and position panels within each zone. The documented installation comparison gives the weight, crew and fixing-work differences; combine that work with the site access and repair sequence when scheduling an occupied building.

Supported handling of a large porcelain cladding panel at ground level
Choose a supported handling method for the actual finished panel and the available site access.

Turn the Survey into a Reviewable Renovation Proposal

A useful initial proposal has two short wall sections: the existing assembly and the proposed assembly. Show the structural backing, retained or removed finish, bracket stand-off, rail, panel build-up and finished face. Add one representative opening and one external corner so the elevation is connected to the detail work.

For the 300 m² example above, the proposal would record the surveyed 30 kg/m² existing facing, the example 12 kg/m² new panel, the separate support-system allowance and the chosen removal route. It would also identify the window-sill changes and the zone order. Those items explain the design choice more clearly than an unsupported percentage saving.

Finished porcelain-faced honeycomb panels stacked in the factory
Keep the selected ceramic face and complete composite build-up identifiable in the proposal.
Facade drawing and material sample being reviewed together
Check measured conditions, panel drawings and the selected appearance together.

Then list the items needed to release the next stage: repaired backing, accepted connection details, panel schedule, opening details and representative sample. The existing facade mock-up and testing plan can help structure the sample stage without repeating that whole process here.

Overseas manufacturers also treat renovation as a separate use case. Funtek porcelain honeycomb panels provide the thin face and reinforced backing discussed here; the wall survey and project details determine how that product is integrated into an existing building. For examples of the category’s overseas use, see Coldspring’s StoneLite renovation applications. Its projects illustrate possible routes; develop the proposed wall details for the selected product.

Discuss a Facade Renovation

Send the project city, existing-wall photographs, approximate area and preliminary elevations. Funtek can discuss a porcelain honeycomb panel configuration and supply scope for the proposed facade.

LuCharlotte
LuCharlotte

Sintered Stone Specialist & Technical Advisor

About the author

LuCharlotte is a Sintered Stone Specialist & Technical Advisor at Funtek. She writes practical guidance for distributors, fabricators, architects, and project buyers on slab formats, surface finishes, fabrication requirements, applications, and order preparation. Her articles focus on the specifications and checks buyers should verify before selecting or ordering sintered stone.

Explore Collections
1 / 4

Frequently Asked Questions

01

Can existing tiles remain behind new porcelain honeycomb cladding?

They can remain only in a developed overlay proposal that identifies their condition and the support path through to the building. The new panel must not rely on an unassessed old tile finish as its structural backing. Survey the wall and resolve the retained layers, brackets, cavity and opening details before choosing that route.

02

How does a new facade plane affect existing windows?

Moving the outer face forward increases reveal depth and can leave an existing sill too short. Check head, jamb and sill sections together so joints, flashings and water exits remain functional. The return dimensions then become part of the panel fabrication drawings.

03

Can a building remain occupied during recladding?

A phased plan can keep selected areas in use when temporary protection, entrances, escape routes, access equipment and deliveries are coordinated. Occupancy depends on the actual site plan and the work that each zone requires; lightweight panels alone do not establish it.

04

Does a lighter panel remove the need to review anchors?

No. Reduced panel mass changes the permanent load, while anchors also transfer project actions through a particular wall and stand-off arrangement. Review the new support path, the actual backing and the required connection evaluation separately from panel weight.

05

Which drawings help compare recladding and overcladding?

Provide an existing wall section and a proposed section identifying removed and retained layers, bracket stand-off, rails and complete panel build-up. Add a representative window and corner, a marked elevation, survey photographs and a mass schedule. These show the practical differences between the routes.