Residential renovation · Luanda, Angola
Sintered Stone Flooring for a Villa in Luanda
The flooring enquiry came with floor plans and a question about price. The client wanted marble-look sintered stone for about 360–370 m² across two floors and wanted to compare two sizes before a trip to China. We also met the client in a showroom, where the flooring discussion could move from plans to physical material.
- Application
- Interior floors in a private villa
- Estimated floor area
- 360–370 m² across two levels
- Requested formats
- 750 × 1500 mm or 600 × 1200 mm
The villa plans and showroom visit anchor the case. The steps below show how we would take a flooring enquiry like this from samples and pricing through to production, packing and shipment once the client approves the order.
1. We start by marking what the quote covers
The brief set out about 210 m² on the ground floor and 150–160 m² upstairs, with the upstairs measurements still subject to the architect’s confirmation. The ground-floor plan showed a 40 m² kitchen, a 42.78 m² TV room and a 26.23 m² double-height living room, plus corridors and smaller rooms. Those spaces give each format a different cutting pattern.
We start the take-off by listing each room against its floor plan. The interior sintered stone scope includes the specified bathrooms. The pantry is excluded, while the veranda and terraces are on the separate granite request. That gives the client a clear scope before any square-metre price is applied.
What the buyer seesAreas by level, the estimated floor coverage and the spaces included in the enquiry.
2. We meet the client and look at the stone in person
The client and our team met in a showroom. A hand sample is useful for judging surface texture and undertone. A full slab shows how the same veins read across a much wider area. For a villa with a large living room and several smaller rooms, it helps to see the material at both scales.
For an enquiry like this, we use that discussion to narrow the look before preparing samples or a quote. We ask which rooms should share the same background colour, where the client wants a quieter pattern, and whether a bathroom finish needs to sit next to the main floor at a doorway.
What the buyer can compareOverall pattern at slab scale and colour, sheen and texture at sample scale.
3. We compare samples for the living areas and bathrooms
Take the warm ivory marble look shown in the villa renderings. We would shortlist available designs with a similar background colour and check which product and finish combinations suit the proposed floor. Labelled samples help the client compare a general flooring finish with a bathroom option under the same light. A full-slab photo shows how the pattern will look beyond the sample.
The client requested R10 or R11 for the bathrooms. We check the test report for the exact surface being considered and review any separate wet-barefoot requirement with the project team. The bathroom floor can then be reviewed for both appearance and its intended use. See how floor finishes and slip-test results are compared.
The Zander Rooftop residential interiors case study shows how pattern direction and fabricated pieces were coordinated across floors, walls and furniture in a Berlin home.
What the buyer receivesA sample shortlist, product and finish references, and available test documentation for the proposed bathroom surface.
4. We quote both formats on the same basis
The client asked for indicative FOB Guangzhou pricing. Our comparison would start with the same preliminary room areas for both formats and set out the general floor and bathroom finish on separate lines. For each option we would show the quoted thickness and finish, the price basis, whether it covers full slabs or cut-to-size pieces, and the allowances for cutting, spares and export packing.
| Finished format | Area per piece | Check on the layout |
|---|---|---|
| 750 × 1500 mm | 1.125 m² | Long joint lines in the main rooms and cuts at the veranda threshold. |
| 600 × 1200 mm | 0.72 m² | Edge cuts along corridors and around bathroom fixtures. |
We also identify the parts of the scope Funtek can supply or process and any items to be sourced separately. A final quantity comes from the approved layout, including any restrictions on rotating veined pieces.
What the buyer receivesTwo price options with comparable scope, stated assumptions and a list of decisions still open.
5. We confirm the details the factory will work from
To follow one option through the factory, assume the client chooses 750 × 1500 mm for the main floors and a coordinating 600 × 1200 mm bathroom finish. Before locking in quantities, we ask the architect to confirm the upstairs areas and verify the transitions that affect the cutting plan. On this villa plan, the opening over the living room and the outdoor terraces help define the limits of the upper-floor stone scope.
For a cut-to-size order, we align the confirmed size, thickness, finish and pattern direction with the latest drawing revision and piece quantities. We agree who approves the final drawings and who cuts the last pieces at site transitions. We then record the sample reference, accepted quantities, spares and packing requirements on the order.
What the buyer approvesThe material reference, order quantities and dimensioned cutting list or full-slab supply scope.
6. We coordinate the batch and cut to the agreed sizes
With the specification agreed, we check whether the approved material can be reserved from stock or needs a new production batch. For a new batch, we give production the agreed product, thickness, surface and sample reference, then compare representative slabs with that reference before cutting. We keep matching material together for connected areas where joint lines and veining are most visible.
If Funtek is supplying finished modules, we give the factory the approved cut list. The first pieces are checked against the specified dimensions, finish and edge requirements before the remaining batch proceeds. We keep the general-floor and bathroom finishes identifiable through cutting and staging, and share agreed production updates with the client. See Funtek’s fabrication and project supply capabilities.
What the buyer receivesProduction timing and the agreed progress or first-piece records.
7. We check the pieces before they go into crates
The inspection starts with the approved sample and the confirmed order. We check product, batch, format, finish and counts. We also inspect visible faces and edges, and check dimensions and thickness at the agreed inspection points. A visual comparison of pieces from the same area helps identify shade or finish differences that need to be resolved.
For the villa scope, the pre-shipment record would show the general flooring and bathroom finish separately. Any piece that needs a recheck is set aside before the approved material is released for packing. See Funtek’s inspection standard.
What the buyer receivesAgreed inspection photos and records linked to the product, batch and finished dimensions.
8. We pack and label the order for receiving
We choose the crate or frame around the approved piece dimensions, thickness and handling plan. Separators protect the faces. Edge and corner guards protect the areas most exposed during handling. Grouping pieces by finish or floor, where agreed, helps the receiving team identify what to open first.
We make the crate marks match the packing list. For a villa order, the list can show the material, size, finish, quantity, package dimensions and gross weight, with spare pieces identified so they can be kept aside on arrival.
What the buyer receivesPacking photos, package marks and a packing list that maps the material to each crate.
9. We document loading and hand over the shipment
Before dispatch, we confirm the named loading point, shipping terms, consignee details and cut-off with the forwarding team. The Luanda brief requested FOB Guangzhou pricing. If FOB is agreed for the order, we coordinate delivery on board the buyer’s nominated vessel at the named port. The final terms should reflect the actual handover arrangements. See the ICC rules for FOB.
At loading, we reconcile the crate count and marks against the final packing list and record the securing arrangement, container number and seal. We coordinate the invoice, packing list and bill of lading details as applicable and share available departure and arrival updates. Before arrival, the buyer can use the package weights and identifiers to plan unloading and check the shipment against the order. See Funtek’s shipping and document support.
What the buyer receivesLoading photos, container and seal details, the final packing list and the applicable shipping documents.